Site preparation, grading and associated excavation or backfilling when included in the project scope.
Roads & Asphalt Works
Rayat Al-Imar undertakes road, asphalt and site-preparation work for access routes, roads, parking areas and yards against approved drawings, specifications and scope. Levels, pavement layers, quantities and required testing responsibilities are reviewed before pricing.
What the service can include
The exact items, supply responsibilities and handover requirements are confirmed in the quotation and project contract.
Preparation of subgrade and base layers and placement of asphalt layers specified in the drawings and requirements.
Definition of areas, layer thicknesses, quantities, survey responsibilities and tests in the quotation.
From scope review to handover
- 01
Review available road or site layouts, levels, pavement layers, quantities and specifications.
- 02
Define site-preparation and pavement-layer scope, supply and survey responsibilities, and required tests.
- 03
Execute the agreed work sequence while coordinating site movement and other activities.
- 04
Review levels, layers and acceptance points and complete included observations before handover.
Work is followed against approved levels, layers, thicknesses and specifications, with checks at site-preparation stages and defined acceptance points. Compaction, material or asphalt tests are coordinated when required by project documents, and their provider and responsibility are stated in the agreed scope.
Questions about this service
What information is needed to quote road and asphalt works?
Share the road or site layout, lengths, widths, levels, specified layers or thicknesses, available quantities and project location. Photos or a soil report, if available, can help describe site conditions.
Does the service include excavation and backfilling?
Excavation and backfilling can be included when shown in the drawings and requested scope; the quotation identifies the items, quantities and responsibilities.
Are quality tests included?
Required tests and their provider are defined by the project documents and quotation; testing or its cost is not assumed to be included unless stated.




